Bored holes and “pipe sleeves” should be large enough to allow free movement of Buteline PB-1 pipe. Below are the suggested minimum hole sizes. Larger holes may be required to ease pipe through if changing direction.
Use of silicone in the holes is not required.
When feeding pipe through metal studwork, concrete or brickwork, protective sleeves or grommets MUST be used to protect against abrasion.